N.D.
Dimensions
40.4 P X 22.2 P
Construction year
1974
Heating system
Electric baseboard units
Water supply
Municipality
Heating energy
Electricity
Windows
Aluminum
Windows
PVC
Foundation
Poured concrete
Siding
Aluminum
Siding
Stone
Basement
6 feet and over
Basement
Finished basement
Basement
Separate entrance
Roofing
Asphalt shingles
Dimensions
119 P X 265.3 P
Land area
31503.8 SF
Sewage system
Municipal sewer
Zoning
Commercial
Zoning
Residential
Driveway
Asphalt
Equipment available
Wall-mounted air conditioning
Garage
Detached
Proximity
Highway
Proximity
Daycare centre
Proximity
Hospital
Proximity
Park - green area
Proximity
Elementary school
Proximity
High school
Proximity
Public transport
Parking
Outdoor
Parking
Garage
Topography
Flat
Inclusions:
N.A.Exclusions:
N.A.| Taxes & Costs | |
|---|---|
| Municipal taxes (2026) | 12272$ |
| School taxes (2026) | 577$ |
| TOTAL | 12849$ |
| Monthly fees | |
|---|---|
| Energy cost | 0$ |
| Common expenses/Base rent | 0$ |
| TOTAL | 0$ |
| Evaluation (2026) | |
|---|---|
| Building | 179900$ |
| Land | 504900$ |
| TOTAL | 684800$ |
in this property
Daniel Payette
Stéphanie Lamontagne
N.D.
Heating system
Electric baseboard units
Water supply
Municipality
Heating energy
Electricity
Windows
Aluminum
Windows
PVC
Foundation
Poured concrete
Siding
Aluminum
Siding
Stone
Basement
6 feet and over
Basement
Finished basement
Basement
Separate entrance
Roofing
Asphalt shingles
Sewage system
Municipal sewer
Zoning
Commercial
Zoning
Residential
Driveway
Asphalt
Equipment available
Wall-mounted air conditioning
Garage
Detached
Proximity
Highway
Proximity
Daycare centre
Proximity
Hospital
Proximity
Park - green area
Proximity
Elementary school
Proximity
High school
Proximity
Public transport
Parking
Outdoor
Parking
Garage
Topography
Flat
Inclusions:
N.A.Exclusions:
N.A.| Taxes et coûts | |
|---|---|
| Taxes municipales (2026) | 12272$ |
| Taxes scolaires (2026) | 577$ |
| TOTAL | 12849$ |
| Frais mensuels | |
|---|---|
| Coût d'énergie | 0$ |
| Frais commun/Loyer de base | 0$ |
| TOTAL | 0$ |
| Évaluation (2026) | |
|---|---|
| Bâtiment | 179900$ |
| Terrain | 504900$ |
| TOTAL | 684800$ |

























